This past weekend we had more new faces and were able to get many things accomplished.  We have a few painted rooms!  We have an exhaust fan in the bathroom!  Brian is almost finished sanding and sealing the floors!  Thanks to those who helped, thanks to those who donated materials and funds.  We continue to be humbly grateful and in awe as we watch God working through His people in this situation.  
Things are coming together for sure, but as we look at the calendar, the deadline is closing and there are no more push-backs.  Even thought it may still look impossible to be move-in ready in just a few weeks, with God?  We know with God we can accomplish many things.  He is on our side and know He is faithful.  Thank you for trusting Him as you come along side to help bear this burden with us (Gal. 6:2).  


Below you'll find updated lists for what needs to be accomplished the upcoming 2 weeks. 
*Items in bold are things Helpers can do.

**Please let us know if/when you'll be coming so that we can plan according to how many people will be there to help**

We need to get all of these things finished this week/weekend (Thurs - Mon 5/23-5/27):
  • roof repair
  • sand remaining walls, then wipe those walls*
  • prime/paint remaining walls*
  • texture ceilings*
  • sand/finish floors
  • hang cabinets
  • repair upstairs bathroom floor*
  • fix lazy susan*
  • touch up cabinet paint*
  • convert cabinet to sink base*
  • caulk/foam windows/doors*
Then, next week/weekend (Thurs - Sun 5/30-6/2) we will need to do these things:

  • install laminate flooring
  • install carpet
  • install kitchen counter top, sink
  • install bathroom fixtures
  • patch/paint around new windows (hopefully they'll be in)*

  • install trim if we have time/materials
  • put covers on switches and outlets*
  • clean, clean, clean*
The following week would be cleaning/moving week.  And that's it, folks!  We are out of time!  

Obviously, This is a very tight schedule! We need as much help as possible!

Updated materials/supplies needed:
  • leveling compound and vinyl for upstairs bathroom
  • bathtub/shower enclosure for upstairs bathroom
  • plumbing fittings for kitchen sink drain
  • outlet and switch covers
  • carpet, tackless strip
  • baseboards, window/door casing